AREA 1 MEXICO ICSS

Mexico Area 1 Development Phase II strengthened offshore power and communication infrastructure connecting 1 FPSO, 4 WHP platforms, and the onshore ORF facility. Composite submarine cables with optical fiber enabled reliable power distribution and data connectivity across the entire offshore production network.
AGOGO

In the icy waters of the Barents Sea, near Hammerfest, ENI Norge launched one of the most ambitious offshore projects ever built — the Goliat FPSO, the first floating production unit to operate in this extreme environment. Designed to withstand the Arctic’s unpredictable conditions, Goliat quickly became a symbol of innovation and engineering courage. Built […]
BOROUGE 4

Large petrochemical expansion project in the UAE. Post-order activities focused on automation system alignment and performance optimization within a major industrial complex.
NGUYA

Built at Wison’s shipyards in Nantong and Zhoushan, with final integration completed in Qidong, the Nguya FLNG was delivered to Eni in just 35 months from first steel cut, a fast-track benchmark for its class. Developed under a modular EPC strategy and powered by the efficient IPSMR® process, the unit has now achieved its first […]
NENE FIELD ICSS INTEGRATION

Within the Congo LNG integrated development, Key Solution played a central role in the EICT integration Engineering and Commissioning across offshore, FLNG, FPU, and onshore assets. In a highly interconnected and fast-track environment, we ensured operational coherence between platforms, Scarabeo 5 FPU, Tango and N’GUYA FLNG, OPT, and telecom networks. Through structured ICSS design, C&E […]