DUNGA

Dunga onshore oil treatment plant in Kazakhstan, ICSS integration and operational support ensuring system reliability and continuous production in evolving facility.

Onshore oil treatment facility in Kazakhstan supporting field development and integration activities. The project included ICSS integration and operational support, ensuring system reliability and continuity of production within an evolving plant configuration.

AREA 1 MEXICO ICSS

Mexico Area 1 Development Phase II strengthened offshore power and communication infrastructure connecting 1 FPSO, 4 WHP platforms, and the onshore ORF facility. Composite submarine cables with optical fiber enabled reliable power distribution and data connectivity across the entire offshore production network.

AGOGO

Agogo FPSO offshore Angola, integrated ICSS system with control and safety engineering, commissioning and startup of deepwater floating production unit

In the icy waters of the Barents Sea, near Hammerfest, ENI Norge launched one of the most ambitious offshore projects ever built — the Goliat FPSO, the first floating production unit to operate in this extreme environment. Designed to withstand the Arctic’s unpredictable conditions, Goliat quickly became a symbol of innovation and engineering courage. Built […]

BALEINE 2

offshore production in Côte d’Ivoire,oil and gas development

Baleine Phase 2 offshore Côte d’Ivoire brings production to 60,000 bopd and 70 MMscf/d of gas using the FPSO Petrojarl Kong and FSO Yamoussoukro. Delivered on a fast-track schedule, the project strengthens national energy supply and confirms Côte d’Ivoire’s growing role in the global energy market..

BOROUGE 4

Borouge 4 petrochemical complex in UAE, large-scale industrial expansion with automation system alignment and performance optimization in advanced processing facility

Large petrochemical expansion project in the UAE. Post-order activities focused on automation system alignment and performance optimization within a major industrial complex.

NGUYA

Aerial view of a large red FPSO production ship with an active gas flare and helipad anchored in the open ocean.

Built at Wison’s shipyards in Nantong and Zhoushan, with final integration completed in Qidong, the Nguya FLNG was delivered to Eni in just 35 months from first steel cut, a fast-track benchmark for its class. Developed under a modular EPC strategy and powered by the efficient IPSMR® process, the unit has now achieved its first […]

NENE FIELD ICSS INTEGRATION

Within the Congo LNG integrated development, Key Solution played a central role in the EICT integration Engineering and Commissioning across offshore, FLNG, FPU, and onshore assets. In a highly interconnected and fast-track environment, we ensured operational coherence between platforms, Scarabeo 5 FPU, Tango and N’GUYA FLNG, OPT, and telecom networks. Through structured ICSS design, C&E […]